54 changes: 34 additions & 20 deletions documents/phase-15-plan.adoc
Original file line number Diff line number Diff line change
Expand Up @@ -55,7 +55,7 @@ It owns deterministic, source-local feedback:

. root formatting and root unit tests;
. app formatting, compilation/static analysis, and the ordinary complete app
test suite, without ExUnit tag filtering; and
test suite via `mix test --exclude ci_only`; and
. any similarly local check added later.

The implementation target is a warm run in no more than five seconds on an ordinary
Expand Down Expand Up @@ -89,18 +89,28 @@ Inventory every command currently run by `mix precommit`, `mix ci`, and the
GitHub workflows. For each, record its owner, dependencies, network/service
requirements, and warm-run cost.

Do not introduce an ExUnit `ci_only` tag, an `--only` test invocation, or a
test-exclusion tier in this phase. Both gates run the ordinary app test suite.
SQLite files created privately by tests are acceptable when they remain
self-contained and within the local time budget; an externally managed database
is CI-only.
Adopt the `ci_only` exclusion mechanism in this phase even though no current
test has that tag: `mix precommit` runs `mix test --exclude ci_only`, while
`mix ci` runs ordinary unfiltered `mix test`. `mix test --only` is not an
approved quality-gate mechanism. SQLite files created privately by tests are
acceptable when they remain self-contained and within the local time budget;
an externally managed database is CI-only.

If the repository later needs a service-backed, native, or end-to-end test
suite, it requires a separate approved plan before implementation. That plan
must identify real tests and their prerequisites, define a named command with
an owner, and include the command and its coverage in the same change. It must
not add an empty placeholder invocation or use `mix test --only` merely to
reserve a future category.
must identify real tagged tests and their prerequisites, define ownership, and
include their coverage in the same change. It may use `@tag :ci_only` only with
this already-established contract:

* `mix precommit` runs `mix test --exclude ci_only`, so the local gate omits
those deliberately slower or service-dependent tests;
* `mix ci` runs ordinary `mix test` with no `--only` or `--exclude` flag, so it
includes both the normal suite and every `ci_only` test; and
* the tag is not globally excluded in `test_helper.exs` or any environment
configuration, because CI must include it by default.

The future plan must not add a new empty placeholder invocation, and it must
never use `mix test --only` merely to reserve a category.

=== 2. Implement the local gate

Expand All @@ -111,17 +121,18 @@ execution for unit tests, and document that dependencies must already exist.
Remove from it, at minimum, `deps.get`, Hex/dependency audits, pull-request
title validation, remote/range Git validation that can fetch, and every
external-service or integration command introduced by a later approved plan.
Do not exclude any portion of the ordinary app test suite. Add regression tests
that assert both the included order and the absence of `--only`/`ci_only`
filtering.
Its app test step is always `mix test --exclude ci_only`; that excludes nothing
today but gives a future planned tagged suite the correct local behavior. Add
regression tests that assert the included order, the exact `--exclude ci_only`
local command, and the absence of `--only`.

=== 3. Implement the CI gate

Make `Mix.Tasks.Ci` an independent orchestrator, not an alias. It performs
environment/bootstrap work as needed, invokes the local gate, and then runs
the CI-only checks. It owns dependency and security audits, PR-title and
commit-range validation, and only integration/service commands introduced by a
later approved plan.
commit-range validation, the ordinary unfiltered app `mix test` suite, and only
integration/service commands introduced by a later approved plan.

Design the task so local CI-equivalent runs can state their prerequisites and
fail clearly if a required service is unavailable. Do not conceal external
Expand Down Expand Up @@ -154,9 +165,10 @@ preserve Phase 14's required protection behavior.

== Linear issue decomposition

1. *Inventory checks and protect the ordinary test suite.* Record current
costs/dependencies and enforce that neither gate uses `--only`, `ci_only`,
or an empty placeholder test tier.
1. *Inventory checks and establish the test boundary.* Record current
costs/dependencies; enforce `mix test --exclude ci_only` in `precommit`, an
unfiltered `mix test` in `ci`, no global `ci_only` exclusion, and no
`--only` invocation. Future plans may add real tagged tests to that boundary.
2. *Restore `mix precommit` as a local gate.* Implement the lightweight task,
documentation, and task tests after classification is available.
3. *Make `mix ci` the full integration gate.* Implement CI orchestration,
Expand All @@ -172,8 +184,10 @@ preserve Phase 14's required protection behavior.
* `mix precommit` needs no network, credentials, Git fetch, container runtime,
externally managed database, or other service after dependencies are present.
* `mix ci` runs every `mix precommit` check plus documented CI-only checks.
* Tests enforce both command sequences and reject `--only`/`ci_only` test
filtering.
* Tests enforce both command sequences: `precommit` uses
`mix test --exclude ci_only`; `ci` uses unfiltered `mix test`; neither uses
`--only`; and no global `ci_only` exclusion is configured. Future plans may
add real tagged tests to this established boundary.
* GitHub Actions calls `mix ci`; Conventional Commit and PR-title validation
remain required CI behavior.
* Developer documentation describes the two commands without calling the local
Expand Down